AT&T copper retirement: what the notice means for your building

Short answer

AT&T is discontinuing copper-based phone service area by area. Its December 1, 2025 FCC application covers about 90,000 customers in parts of 18 states, with service ending on or after November 15, 2026, and AT&T says it aims to exit legacy copper operations across most of its footprint by the end of 2029. If you get a notice, match it to your lines, replace elevator and fire alarm lines first, and compare AT&T's own replacement with independent options before the date.

I'm an independent technology advisor. Some of the providers I compare pay me for advising you. It doesn't change how I compare options. How I get paid.

On this page
  1. Who this page is for
  2. What the letter usually says
  3. Two FCC processes: copper retirement and discontinuance
  4. What AT&T has announced, with dates
  5. State actions: the California example
  6. What to do when you get a notice
  7. What AT&T offers vs independent options
  8. What the numbers in AT&T’s filings show
  9. My recommendation by scenario
  10. Common mistakes

Who this page is for

  • You received a letter from AT&T saying a phone service at one of your buildings will be discontinued.
  • You manage elevator phones, fire alarm lines or call boxes on AT&T copper.
  • You want the actual dates and rules, not headlines.
  • You need to decide between AT&T’s replacement and other options.

What the letter usually says

AT&T’s example notice in its December 2025 application tells customers their current plan “will be discontinued on November 15, 2026.” It offers a move to AT&T Phone - Advanced or an AT&T wireless plan, and explains how to comment to the FCC (AT&T filing).

The letter is addressed to the account, not to the device. It does not tell you that line 3 is the elevator and line 4 is the fire panel. That part is your job, and it is the first thing to do.

Two FCC processes: copper retirement and discontinuance

Carriers use two different procedures, and the notice you got may come from either.

Copper retirement (network change). The carrier replaces its copper facilities with fiber or wireless. Under the FCC’s March 2026 order (FCC 26-19):

  • Carriers no longer file these network change disclosures with the FCC, and the FCC no longer issues public notices for copper retirements.
  • Carriers must still post public notice through industry forums, publications or a public website.
  • They must give direct notice to interconnected providers and to 911 service providers.
  • A copper retirement that also discontinues a service still needs FCC approval under Section 214.

Service discontinuance (Section 214). The carrier stops offering a service, such as AT&T Business Local Exchange Access Line Service. The same order:

  • Gives every discontinuance application a 31-day automatic grant period, unless the FCC acts otherwise.
  • Replaces the old Adequate Replacement Test and Alternative Options Test with one rule: an application is streamlined if one of five replacement services is available throughout the area, such as facilities-based VoIP or mobile wireless at 5/1 Mbps or faster.
  • Requires carriers to notify customers no later than the filing date, with information on replacement options.
  • Finds that federal law preempts state and local rules that needlessly constrain IP network deployment.

How the rules got here. In March 2025 the FCC’s Wireline Competition Bureau issued temporary waivers, including a two-year waiver of network change filing requirements (FCC 25-37). The FCC proposed permanent rules in July 2025 and adopted them on March 26, 2026. I have not confirmed the effective date [VERIFICAR].

Comment windows. In the FCC public notices I reviewed, comments were due 15 days after release. For example, notice DA 25-990 was released November 25, 2025, with comments due December 10.

What AT&T has announced, with dates

Date What happened Source
Dec. 3, 2024 AT&T says it is working to exit legacy copper operations across the large majority of its wireline footprint by the end of 2029 AT&T release
July 2025 Application for about 21,000 customers in parts of 17 states; discontinuance on or after June 30, 2026 AT&T filing
Nov. 3 to 14, 2025 Customer notices mailed for the next application AT&T filing
Dec. 1, 2025 Application for about 90,000 customers in parts of 18 states; discontinuance on or after Nov. 15, 2026 AT&T filing
Jan. 12, 2026 AT&T says the FCC approved discontinuing copper-based services in an additional 25% of its wire centers AT&T
Mar. 26, 2026 FCC adopts the new network change and discontinuance rules FCC 26-19
Apr. 23, 2026 Application for 236 customers in parts of 39 wire centers, citing road construction; on or after July 14, 2026 AT&T filing
May 20, 2026 California application for about 15,000 business customers in parts of 360 wire centers; on or after June 1, 2027 AT&T filing

The 18 states in the December 2025 application are listed in the FAQ below. Coverage is by wire center, not by whole state.

State actions: the California example

California is where AT&T’s plan meets the most resistance.

  • On June 28, 2024, the California Public Utilities Commission rejected AT&T’s request to withdraw as carrier of last resort, and opened a new rulemaking on those rules (CPUC).
  • The CPUC also said its carrier of last resort rules are technology-neutral and do not stop AT&T from retiring copper facilities.
  • The rulemaking, R.24-06-012, held workshops through August 2025 (CPUC).
  • On May 20, 2026, AT&T asked the FCC to declare that California rules conditioning its POTS discontinuance are preempted. The FCC took comments through July 7, 2026, in WC Docket No. 26-125 (DA 26-520).

In other states, AT&T serves copies of its applications on the state commission. The Florida Public Service Commission copies are the ones I used here. Your state commission’s docket is a good place to look for filings that name your area.

What to do when you get a notice

  1. Read the details. Write down the service name, the service address, the date and the docket number.
  2. Match the notice to your lines. Use the account number and the bill. The property manager inventory steps work for any building.
  3. Flag the life-safety lines. Call your elevator contractor and your fire alarm company the same week. See elevator phone lines and fire alarm communicators.
  4. Get quotes. Ask AT&T for its replacement terms in writing, and get at least one independent quote.
  5. Comment if you need to. If the change puts a safety system at risk and you need more time, the notice explains how to tell the FCC.
  6. Cut over before the date. Keep the copper line until the new path passes testing.

Don't wait for a second letter. In an AT&T notice for a related service, AT&T wrote that after the date the service "is subject to disconnection" (AT&T filing).

What AT&T offers vs independent options

Option Best for How it works Pricing info Pros Cons
AT&T Phone - Advanced (home) Residential lines Device on AT&T’s network, broadband first and cellular backup $45.00 per month plus taxes and fees, as of October 2026 (AT&T) Keeps the number Battery does not power connected devices; no 911 without power
AT&T Phone for Business - Advanced (now AT&T Business Voice) Simple business voice, fax and alarm lines AT&T device on its LTE network $99.99 per month before taxes and fees, with an AT&T-owned device, per AT&T’s filings Offered in the notice; an FCC public notice on another carrier’s application describes it as an adequate replacement (DA 26-137) Single carrier; notices do not address elevators or fire panels
AT&T wireless plan Single voice lines A mobile line Not listed in the notices Simple Not for alarm panels or elevators
Independent POTS in a box Mixed lines in one building Managed LTE device, often dual carrier Quote only; see POTS in a box Several line types per device, monitoring portal Another vendor contract
Dedicated communicators Fire alarm panels, elevator phones Listed device installed by the system’s contractor Dealer pricing Fits the AHJ and monitoring company One contract per system

AT&T’s notices describe AP-A as supporting “phone calls, fax machines, alarms, medical monitoring, and 911 access.” Its April 2026 filing adds that the battery lasts about 24 hours on standby and does not power medical or security monitoring equipment.

What the numbers in AT&T’s filings show

AT&T’s December 2025 application says its legacy business line averages about $1,700 per month at listed rates, while most business customers pay an effective rate under $200 per month. In California, AT&T gives a guidebook rate of about $2,700 per month before discounts.

Compare your own bill, not these averages. The POTS cost calculator shows what your lines cost now against any quote.

My recommendation by scenario

  • If your notice covers 1 to 3 plain voice or fax lines: AT&T’s replacement may be the simplest choice. Get the terms in writing.
  • If the notice covers an elevator or fire alarm line: treat those lines separately and ask the inspector and fire marshal what they accept. AT&T’s notices don’t address them.
  • If you manage many buildings: use the notice dates to schedule waves, and compare one independent provider across the portfolio. See POTS replacement for property managers.
  • If you are a school or district: align the life-safety cutover with breaks, but never past the notice date. See POTS replacement for schools.
  • If you are in California: the timeline is longer, but AT&T has filed. Start the inventory now.

Common mistakes

  1. Assuming the letter covers every line. It covers the service and address named. Other accounts may get different dates.
  2. Waiting for the FCC to deny it. The 31-day automatic grant makes approval the default.
  3. Accepting the default offer for a fire panel. Ask the alarm company and the AHJ first.
  4. Cancelling copper before the new line passes tests. Keep both until acceptance.
  5. Losing the notice. It has the docket number and the date you will need.

The full comparison of approaches and providers is in the POTS line replacement guide, and terms like Section 214 are in the glossary. If you already have a notice, send it to me with your line list.

Frequently asked questions

Is AT&T discontinuing copper landlines in my state?

AT&T's December 2025 application covers parts of Alabama, Arkansas, Florida, Georgia, Indiana, Kansas, Kentucky, Louisiana, Michigan, Missouri, Mississippi, North Carolina, Ohio, Oklahoma, South Carolina, Tennessee, Texas and Wisconsin. Coverage is by wire center, so only your own notice tells you whether your address is included.

When will AT&T stop copper phone service?

It depends on the application. The December 2025 application gives on or after November 15, 2026, a July 2025 application gave on or after June 30, 2026, and a May 2026 California application gives on or after June 1, 2027. AT&T's stated goal is to exit most copper operations by the end of 2029.

What does an AT&T copper retirement notice mean for my building?

It means AT&T plans to stop offering the copper-based service on that account after the date in the letter, pending regulatory approval. Every device on those lines, including elevator phones and fire alarm dialers, needs a new connection before then.

Can I keep my copper line after the date?

Generally no. Once the discontinuance is authorized, AT&T can stop providing the service on or after the date in the notice, so plan the replacement before that date.

Can I object to AT&T's discontinuance?

Yes. The notice explains how to file comments with the FCC and gives the docket number. In the FCC public notices I reviewed, comments were due 15 days after the notice was released.

Does AT&T Phone - Advanced work for elevators and fire alarms?

AT&T's notices say it supports phone calls, fax machines, alarms, medical monitoring and 911 access, but they do not mention elevators or fire alarm panels. Confirm with your elevator inspector and fire marshal before using it for those lines.

What is the difference between copper retirement and discontinuance?

Copper retirement replaces the carrier's copper facilities and is handled through public network change notices. Discontinuance means the carrier stops offering a service and needs FCC authorization under Section 214.

Free quote, no obligation

Tell me about your setup. I will compare options for you.

Fill in two short steps. I review every request myself, compare at least two providers that fit, and reply with a plain-English summary.

Prefer to talk first?Book a 15-minute call
Step 1 of 2: How can I reach you?

Step 2 of 2: Tell me about your setup
What do the lines connect to? (check all that apply)

I reply within 2 business hours, Monday to Friday, 9 am to 6 pm Eastern. I only use your details to answer this request. See the privacy policy.

Sources

  1. AT&T Section 63.71 application to discontinue legacy voice service in 18 states, Dec. 1, 2025 (Florida PSC copy) · accessed October 2026
  2. AT&T Section 63.71 application, about 21,000 customers in 17 states, July 2025 (Florida PSC copy) · accessed October 2026
  3. AT&T Section 63.71 application, 39 wire centers, Apr. 23, 2026 (Florida PSC copy) · accessed October 2026
  4. AT&T Section 63.71 application for Remote Call Forwarding and TeleBranch, Dec. 1, 2025 (Florida PSC copy) · accessed October 2026
  5. AT&T: Analyst & Investor Day 2024 release, Dec. 3, 2024 · accessed October 2026
  6. AT&T: Advances network modernization with FCC approval, Jan. 12, 2026 · accessed October 2026
  7. FCC 26-19, Report and Order, Mar. 27, 2026 · accessed October 2026
  8. FCC 25-37, Notice of Proposed Rulemaking, July 25, 2025 · accessed October 2026
  9. FCC DA 25-990, public notice on AT&T discontinuance applications, Nov. 25, 2025 · accessed October 2026
  10. FCC DA 26-137, public notice on Granite discontinuance application, Feb. 10, 2026 · accessed October 2026
  11. FCC DA 26-520, AT&T petition on California rules, May 22, 2026 · accessed October 2026
  12. AT&T California business POTS discontinuance application, May 20, 2026 (CPUC copy) · accessed October 2026
  13. CPUC: Rejects AT&T request to withdraw as carrier of last resort, June 28, 2024 · accessed October 2026
  14. CPUC: Carrier of Last Resort rulemaking R.24-06-012 · accessed October 2026
  15. AT&T Phone - Advanced product page · accessed October 2026